Project History and Planned Repairs
2024
July 2024:
🎉 We’re thrilled to announce the official reopening of Pier M after an extensive renovation.
What’s New?
• Brand-new floats
• Upgraded decking
• Fresh electrical systems
• And much more!
March 2024:
Repair & Update Project - it’s finally time to update our wood structure into a more sturdy and one with less maintenance. We are very excited that we have all the required permits, and the start date for our project is April 8th! We want everyone to be safe and for the work to be finished as rapidly as possible, accordingly,
Pier M and its parking lot will be CLOSED from March 18 until the repairs/updates are completed. The project is expected to take approximately two months.
2019
June - Replaced and tightened deck boards. In October, addressed pier stability issues by installing piling sleeves.
2018
October - Cleaned pier and changed the stain color to gray.
2017
Deck boards will be replaced or screwed down as needed in August. The deck will be stained in the spring of 2018 to protect the pier. Boat owners, you can leave your boats in your slip while the work is being done.
2015
July - There was an extensive up-fit of the pier completed. This work included replacing 50 damaged boards, pressure washing and staining the walkway and dock. Also, waterproof LED lighting was installed along the sidewalk leading from the parking area down to the pier.
2014
July - Resolved an issue with the dock lighting, replaced 15 bulbs with CFL lights, replaced all the slip numbers, secured rub rails and replaced 16 damaged boards.
2013
June - replaced some deck boards and secured loose boards.